Posts Tagged ‘construction delays’

Warming Heights Living Room With Faux Grasscloth

August 7, 2020


Top photo – you’re looking at a living room in a beautifully renovated 1910 home in the Woodland Heights neighborhood of Houston. The bottom 3/4 of the walls are clad in beautiful white board-and-batten paneling. I skim-floated (smoothed) the upper 2′ of wall space a few months ago – and, due to construction delays, the poor family has been living with these uninspiring grey walls ever since.

Today I was able to finally get their paper up on the wall. This is an embossed vinyl faux grasscloth product by York. It is good quality, and the close-up shot shows that it does a good job of mimicking real grasscloth in texture and design. Unlike real grasscloth, because this material is vinyl, it will be resistant to stains. And because it’s man-made, there won’t be the sharp color variations from strip to strip.

However, like real grasscloth, this particular product does not have a pattern match (some by other manufactures, like Thibaut, do have a pattern match). No pattern match means that you will see a visible pattern break at every seam, every 27″ apart.

The homeowner knew immediately that she would not be happy with that. So she suggested running the material horizontally instead of vertically (called “railroading”). The width of the wallpaper accommodated the height of the wall space wonderfully, and we had just enough yardage to cover each of the four wall areas without having to splice any paper.

Another benefit is that, with the “grass” in the design directed vertically, it correlated nicely with the vertical paneling below.

And … the room has special tiny LED lights running along the top of the wainscoting. When turned on, they light up the wallpaper in a beautiful way. If the texture had been running horizontally, those lights would cast some really disconcerting shadows. (Remember when you were a kid and held a flashlight under your chin?!)

The true colors don’t show up well in the photos. This material mixes strands of murky blue, navy, mossy green, and gold. These colors coordinate sooo nicely with the deep blue ceiling, the navy paint in the adjoining dining room, and the tiles in the era-accurate fireplace.

The wallpaper manufacturer is York. The interior designer is Stacie Cokinos of Cokinos Design. She works mainly in the Heights area, and mostly on new builds or whole-house renovations.