
Digital Image

Digital Image

Digital Image

Digital Image
This was one of the most difficult installations I’ve ever done. Many reasons … The grasscloth came un-trimmed, so I had to trim off the selvedge edge by hand for every strip. This is tedious and time-consuming enough with paper, but with grasscloth it’s harder because you have to press hard to get through the thick material. The room itself presents some time-eating elements, namely the intricate molding above the columns, and it takes time (like 20 minutes each) to cut the paper neatly into the curves. There were six of these curved points, plus four angled blocks in the center of the arches.
I told the homeowner to buy 10 single rolls. But the design studio where she bought it told her 8. So she bought 8 – and we were short. So I had to save every scrap, plot and plan, and spend extra time cutting and piecing slivers of left over paper, so we would have enough to do the areas over the arches. I also had to fudge on the pattern match, in order to have enough paper to do the whole room. This pattern is forgiving, so it’s not noticeable.
But the main difficulty was the extreme thickness of the gesso-like material on the paper. It was virtually IMPOSSIBLE to cut through. I mean, on the side of one doorway, on a 6′ drop, I spent a full 30 minutes, pressing with all my strength, and went through a good couple of razor blades, just to trim off the excess paper. Every other cut was equally difficult. Where the razor blades would not cut it, I used my $50 Japanese high technology scissors – which I am sure needs to be replaced after the workout it got last night.
The paper was also uncooperative when it came to wrapping it around two inside corners. It took a lot of work and heavy pressing on it with a special metal plate tool I have, just to get it to look nice and tight in the corners.
Other inside corners where the material was cut, there were small gaps between the thick layers of gesso. All of these were at the top of the walls, so were not very noticeable.
This room should have taken me about five hours to hang, if it had been a regular wallpaper. This couple was kind enough to let me work late to get the room finished. However, I was stunned when I finished, loaded up my van, and got in the driver’s seat – I had not realized how very late it was at night.
This product is by Schumacher. As usual, their quality control was poor. The homeowner had to send back the entire first batch, due to the gesso being smeared. There was one section in the new batch that was messed up, too.
The finished room does look great, though, and the thick texture adds a unique and warm look to this West University entryway. I plotted the pattern so that it would fall in the center of the archway that’s the first thing you see when you walk in the door.